Step 1 – Design

This is where your vision truly begins to take shape. We collaborate closely with you to design a pool that reflects your lifestyle, aesthetic, and how you plan to use the space, all within advanced 3D virtual design software so you can see every detail before construction begins. Together, we refine layouts, features, and proportions, selecting finishes and details that elevate the design until it perfectly aligns with your dream pool.

Step 2 – Excavation

Once the design is finalized and approved, we begin excavation, transforming your yard and bringing the pool’s shape to life. This phase involves carefully removing soil and precisely forming the pool to match the approved design. Excavation typically takes 1 to 3 days, depending on site conditions and access.

Step 3 – Plumbing

During this phase, we install all hydraulic lines and piping that allow your pool to function efficiently and reliably. Each line is carefully laid out to ensure proper circulation, performance, and long-term durability. Plumbing typically takes 3 to 5 days, depending on the complexity of the design and features.

Step 4 – Steel

This step forms the structural backbone of your pool. Engineered steel reinforcement is carefully installed throughout the shell to ensure strength, stability, and long-term structural integrity. The steel phase typically takes 2 to 3 days, providing the foundation needed for a pool built to last a lifetime.

Step 5 – Shotcrete

Shotcrete is where the pool truly becomes a permanent structure. High-strength structural concrete is pneumatically applied over the engineered steel, forming a reinforced concrete shell that locks in strength, durability, and shape. This critical phase typically takes 1 day, bringing the design fully into reality and creating a solid foundation built to perform for decades to come.

Step 6 – Tile & Masonry

This phase is where craftsmanship and personalization begin to shine. Your selected tile and masonry materials are carefully installed onto the pool structure, adding refined details, texture, and character to the design. These elements define the pool’s aesthetic and begin transforming the structure into a polished, custom-built space. The timeframe for tile and masonry installation varies depending on the scope of the project and the materials selected.

Step 7 – Hardscape

Hardscaping completes the surrounding environment of your pool and defines how the space is used and enjoyed. This phase includes installing walking surfaces such as basic concrete, natural stone, or custom porcelain tile, each chosen to complement your design and lifestyle. The timeframe for hardscaping varies depending on the scope of the project and the materials selected.

Step 8 – Interior Finish

The interior finish is the final layer that gives your pool its color, texture, and signature look. Your chosen finish—ranging from classic white plaster to pebble surfaces or a refined polished hydrazo—is pneumatically applied to create a smooth, durable interior. This phase typically takes 1 day, completing the pool and preparing it for filling and enjoyment.

Step 9 – Relax and Enjoy!

This is where it all comes together. Your custom pool is complete—designed, built, and finished with care—ready for your family to enjoy for years to come. From everyday relaxation to lifelong memories, your dream pool becomes a lasting part of your home and lifestyle.